We – EPG Team the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears factory in China with 5 diverse branches. For much more details: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
Specialized data of stainless metal corrugated flexible metallic hose
NO. | DN | ID | OD | Pitch length | Wall thickness | theoretical excess weight |
(KG/M) | ||||||
one | 12 | 11.6 | eighteen | 3 | .2 | .17 |
2 | fifteen | fourteen.four | 21.five | 3.five | .3 | .28 |
three | eighteen | 17.four | twenty five.5 | three.5 | .three | .34 |
4 | 20 | 19.4 | 27 | 4.5 | .3 | .38 |
5 | twenty five | 24.four | 32.five | 5 | .three | .forty six |
6 | 32 | 31.4 | 40 | five.five | .3 | .six |
seven | forty | 39.4 | 50 | six | .3 | .75 |
eight | 50 | forty nine.4 | sixty three | 7.five | .3 | .nine |
nine | sixty five | sixty four.4 | 81 | 9 | .three | one.six |
10 | 80 | seventy nine.2 | 98 | ten.five | .four | 2 |
eleven | one hundred | 99.2 | 120 | 13 | .4 | 2.6 |
twelve | one hundred twenty five | 124 | a hundred and fifty | 14.five | .five | 3.nine |
thirteen | one hundred fifty | 149 | one hundred eighty | 17.5 | .5 | 4.3 |
fourteen | 200 | 198.8 | 240 | 24 | .6 | 6.eight |
fifteen | 250 | 248.four | three hundred | 28 | .8 | 11 |
16 | 300 | 298 | 355 | 33.five | 1 | seventeen.5 |
seventeen | 350 | 348 | 410 | 35 | 1 | 20 |
18 | four hundred | 397.six | 460 | 40 | one.2 | 25 |
19 | 450 | 447.6 | 489 | forty five | 1.2 | 29 |
20 | 500 | 497.6 | 545 | 45 | one.two | 33.5 |
21 | 600 | 597.six | 650 | 50 | one.2 | 40.five |
Set up
1.Stay away from over bending.
The repetitive bending of a hose to a radius scaled-down than the radius shown in the specification tables for corrugated hose will outcome in premature hose failure. Usually give sufficient length to prevent more than bending and to eliminate strain on the hose.
two. Avoid sharp bends
Make use of seem geometric configurations that avoid sharp bends, specially in close proximity to the conclude fittings of the assembly.
3. Provide assist.
When installing the assembly in a horizontal loop, offer assistance for the arms to avert the hose from sagging.
four. Do not lengthen or compress axially
A piping method which makes use of steel hose to absorb movement mu EPT be correctly anchored and/or guided. Always help the piping to stop extreme weight from compressing the hose and soothing the braid stress.
5. Handle with care.
Avoid careless managing of the hose assembly. Always lift or carry metal hose to avoid abrasion damage particularly to braided corrugated hose. Store metal hose assemblies away from locations in which it can be subjected to spillage, corrosive fumes or sprays, weld splatter, and so on. If hose braided is damaged the hose must be removed from service and examined at 1.5 occasions its max operating pressure.
6.Do not overpressurize or expose to high temperature.
The method that the hose assembly is to be installed into shall be secured from overpressurization and from excessive temperature. If hose is uncovered to either above pressurization or extreme temperatures it shall be removed from service and analyzed at 1.5 instances its max operating strain.
Application places
With its potential to satisfy large needs for conveying hot and chilly substances, this modern day engineering has the following major regions of application:
Electrical market and mechanical engineering: as a protective hose for electrical cables or light-weight conductorsAs a suction, conveying and coolant hose, e.g. when conveying and transporting liquid gasAutomotive business: as an exhau EPT gas hose that functions as a vibration decoupler in exhau EPT systemsAs a air flow hose in technological creating equipmentSteel industryMeasuring and manage equipmentMedical equipmentAviation and place travelReactor technologyAlternative energy (solar heat, wind turbines, and many others.)
How to order
To effectively layout a metallic hose assembly for a certain software, the adhering to design and style parameters mu EPT be determined
one. Temperature– the temperature to which the assembly is uncovered to a proper fit
two.Dimension– The diameter of the connections in which the assembly will be mounted is required to be presented
three. Media–This is important considering that you mu EPT be certain that the assembly’s parts are chemically appropriate with the media going by way of the hose as well as the surroundings in which the hose is installed
4.Pressure–Recognize the inner pressure to which the assembly will be uncovered to figure out if the assembly is robust ample for the application
five. Identify the essential conclude fittings. –This is necessary as fittings for the assembly mu EPT be chosen to suit the mating connections properly.
six.If you have special requirements on the corrugated steel hose, plz notify us.
We – EPG Group the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing unit in China with 5 various branches. For far more specifics: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828 The use of original gear manufacturer’s (OEM) portion numbers or logos , e.g. CASE® and John Deere® are for reference functions only and for indicating product use and compatibility. Our business and the shown substitution components contained herein are not sponsored, accepted, or created by the OEM.