EPG has been effectively qualified by ISO9002 Quality Management Method, ISO9001 High quality Management Technique, API certification, ISO/TS16949:2002 and ISO10012 measurement administration system. We have exported our items to Korea, Turkey, Bulgaria, Romania, Russia, Italy, Norway, the Usa, Canada, etc. we have received the have faith in of customers worldwide.
EPTT principal stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd configurations
Principal EPTT | ||||
No. | Identify | EPTTtity | ||
1 | Semi servo sanitary napkin primary EPTT | 1 set | ||
two | Japanese Mitsubishi servo motors | 11 sets | ||
3 | EPTT controlling program: full servo manage | 1 established | ||
four | High speed sawmill crusher | 1 set | ||
5 | Drum former | 1 set | ||
6 | SAP feeding unit established on ground(servo control) | 1 established | ||
seven | Wastage recycling unit | 2 sets | ||
eight | Raw material car unwinding, car pressure management, car detecting, auto splicing and vehicle rejecting system (IncXiHu (West Lake) Dis.Hu (West Lake) Dis. bottom tissue/air-laid paper, absorbent paper, prime sheet nonwoven, PE movie and EPTT movie ) | 5 sets | ||
9 | Touchable EPTT | 1 set | ||
11 | Audio evidence cabin | 1 set | ||
twelve | EPTT net guiEPTT(EPTT) | nine sets | ||
thirteen | Dust EPTTion device | 1 set | ||
sixteen | Seem proof and dust EPTTion device for major line | 1 set | ||
22 | All the air pipes use stainless metal other than the pipe utilised in conveyor suction gadget | one set | ||
twenty five | Davit, weigEPTT restrict 200kgs | two sets | ||
Glue Applicators | ||||
26 | Glue applicator Usa brand EPTTson (optional) | 5 sets | ||
27 | Glue applicator EPTT manufacturer PTT (optional) | 6 sets | ||
28 | The EPTT set EPTT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: | StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd configuration glue applicators (select one particular model) | ||
29 | Supply time: | _one hundred twenty__daEPTTafter deposit payment and sample confirmation | ||
Optional Configurations | ||||
No. | Name | EPTTtity | Price tag (FOB NANEPTTG) | |
1. | EPTT stacker auto bagger (Full computerized EPTT answer ,can save at lEPTT 10-twelve EPTT employees, if decide on this ,no want to decide on stacker ) |
1 established | ||
2. | EPTT Stacker (Semi auto EPTT answer ,can save 4-six EPTT workers ) |
one established | ||
3. | Eyesight detection system (Can reject any polluted item throughout the production,100% detection ) |
one established | ||
4. | EPTT detector (Can detect the EPTT pcs inside of the diapers, portion of QC) |
1 established | ||
five. | Facet cover (three pieces) incorporating unit (Prevent facet leakage) |
1 set | ||
six. | Air compressor (Needed for the generation line ,could be purchased domestically) |
one established | ||
seven. | Air shower place (Wind shower cleanse ahead of EPTTr into the workshop) |
one established | ||
EPTT principal parameters:
one | Style speed | 800pcs/min |
two | Working speed | 600 pcs/min |
3 | Experienced price | 98%(calculate based mostly on 7.5 hours, the price in between experienced items and total creation quantity, other than substXiHu (West Lake) Dis.Hu (West Lake) Dis.rd products brought on by glue applicator mistake) |
four | Generation effectiveness | ge90%( compute based on seven.5 several hours, the price between actual generation amount and concept generation amount) |
5 | Capability | 170KW (Not incXiHu (West Lake) Dis.Hu (West Lake) Dis. the glue applicators) |
seven | EPTT | Three phases 4 wires 380V/50Hz (ground wire) |
8 | Wire | three times120mm2 1 times50mm2 one times25mm2 |
nine | Most affordable stress | six kg/cm2 ge0.6mpa |
10 | Air compressor | two.8 mthree/min |
eleven | Overall weigEPTT | About 70 tons 70 |
twelve | EPTT measurement | 29 times3 times4.5 M (L timesW timesH) 29 times3 times4.5M( occasions occasions) |
13 | Doing work area | 38 times7 times4.5 M (L timesW timesH) 38 times7 times4.5M( times times) |
14 | EPTT color | Off-white (can be changed by get) |
fifteen | Item measurement | 1 dimensions (in accordance to purchase) |
sixteen | Containers | 4 times40HQ |
17 | EPTT: | PE go over EPTT in container |
EPTT main components model:
No. | Title | Brand name | Origin |
one | Servo motor | Mitsubishi | Japan |
two | EPTT web XiHu (West Lake) Dis.Hu (West Lake) Dis.r | EPTT | EPTT |
three | Touchable EPTT | Banner | United states of america |
4 | PLC controlling system | Mitsubishi | Japan |
five | Sensor | Banner | United states of america |
6 | Protection manufacturing | Schneider | France |
8 | Cutter raw substance | D2 | Usa |
9 | Gear (according to usage) | EPTB/BEM/NSK/SKF | EPTT/Germany/Japan/Sweden |
ten | Timing belt | Optibelt or Gates | Germany/United states of america |
11 | Low voltage digital | Schneider | France |
twelve | EPT relationship terminal | EPTT | Germany |
thirteen | Temperature controlling technique | Omron | Japan |
14 | High-velocity joint | EPTC | Japan |
fifteen | Pressure regulating valve | Airtac | EPTT EPTTiwan |
16 | Pneumatic factor | Airtac | EPTT EPTTiwan |
17 | Solenoid valve | Airtac | EPTT EPTTiwan |
18 | Dampness separator | Airtac | EPTT EPTTiwan |
19 | EPTT fault alarm | Mitsubishi | Japan |
20 | Planetary EPTT | APEX | EPTT EPTTiwan |
21 | Liner XiHu (West Lake) Dis.Hu (West Lake) Dis. rail | Hiwin | EPTT EPTTiwan |
EPTT StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd Configuration:
EPTT frame framework and primary figures
Moderately solid sq. steel frame: Panel 25mm thick, undertake specular paint, six surfaces processing, sound cage with sixty * 60mm sq. steel in module layout, the base frame with sq. tube 100mm instances 100mm, 18mm thick bottom plate, 6 area processing also ,widening after EPTT for repair. Spliced kind main board by screw, make positive the large efficiency .
Glue applicators set on the 2nd system, shorten the glue provide distance
The primary air suction bucket is set up with negative pressure screen the air scoop EPTTn wheel is set up with rapid fixture to faXiHu (West Lake) Dis.Hu (West Lake) Dis.tate the elimination of the belt the decrease side of the conveyor belt above the material is put in with help plate to prevent the polymer and foreign issues from falling and polluting the decrease materials (the belt specification is labeled for servicing)
EPT configuration:
one. Driving program
All servo motors unified managed by PLC, realize the treasured adjustment of each and every driving device
Each servo motor managing situation can be proven and revised by means of touchable EPTT
Do not need to alter any EPTT part to adjust product’s size
EPTT can remotely managed, modify parameters according to client’s request, can modify the dimension of all raw materials
It can delete the distinction of mechanical operating in time and promise the certified fee.
EPTT parts and documents:
Identify | EPTTtity | Identify | EPTTtity |
Kit | 1 set | fuse | 10 pcs |
Electric powered heater | 5 pcs | transition wheel | 3 sets |
Cutting blade | 2 pcs | Timing belt | 3 pcs |
Truncation blade | one established | Conveying belt | two pcs |
thermocouple | two pcs | ||
EPT schematic diagram | 1 | back EPTT diagram in | one |
Instruction of main EPTT aspects | one | EPTT structure in PDF | one |
Manufacturing unit-set-up must satisfy these requires:
1: With out vibration, clean and distinct environment, very good air flow, no flammable and explosive and corrosive substances around.
2: Flat concrete ground, concrete quantity need to be at lEPTT three hundred# ground degree difference must be in fifteen-25mm, so that EPTT adjustment is much more practical.
three: Ground ought to have ample bearing capability. Concrete ground thickness is no considerably less than 200mm. if EPTT is put on the 2nd flooring, concrete floor(bolstered concrete pouring) regular bearing capability is at lEPTT 3.5tons/sm. EPTT is place no far more than on the 2nd floor.
four: To maintain at lEPTT one meter distance among the back side of EPTT (incXiHu (West Lake) Dis.Hu (West Lake) Dis. hooked up equipment) and the walls.
five: To avoid the incident due to the uneven floor.
6: The inside of temperature in the manufacturing unit is no less than twelve-15 ordmC.
Uncooked materials shop need to satisfy these needs:
1: Tray cabinets are needed to set at the bottom of raw components in scenario of damp and dampness.
two: Cleanse and distinct surroundings, sealed and shut, no mosquito, no flammable and explosive and corrosive substances around. To keep regular temp. fifteen-30 ordmC inside of the keep is alright.
Raw EPTTs:
EPTT Name | GEPT |
Fluff pulp | 685g/ mtwo |
hydrophilic non-woven as top sheet | 18g/ mtwo |
Perforated movie | 18g/ mtwo |
Tissue paper | 15g/ mtwo |
ADL | 35 g/ mtwo |
Air laid paper | |
Absorbent paper | |
back again sheet PE movie | 24g/ m2 |
EPTT film | 32-35g/ m2 |
Central launch paper | |
Wing’s release paper | |
SAP | |
hot melt adhesive- construction |